Two 1045KW Engine Power Assemblies have been shipped to Russian customer in August, 2020.


The GUP-38E1400P Engine Power Assemblies are widely used in the mining and oil field area, which are providing the suitable power for all types of construction machines.


2020.8-1.jpg

2020.8-2.jpg

2020.8-3.jpg